Reform No Area Recommendation Department Scoring (Weightage) Reforms
31 Change in Land Use (CLU) for conversion to industrial use for land outside of industrial parks/ Industrial Development Corporations (IDC) Furnish information and implement an online application system with the following features and mandate that all applications are submitted online
  • Publish information about the procedure and a comprehensive list of documents required on the Department's website
  • Publish clear timelines on the Department's website mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for decision (approval/ rejection) on the application
  • Allow online application submission, payment thereof, tracking and monitoring without any need of physical touch point for document submission and verification
  • Ensure that the system allows the user to download final signed approval certificate
  • Allow third parties to verify the final approval certificates in public domain
Department of Revenue / T&CP or equivalent 5 Master Plans for ULBs/UDAs have been prepared after detailed study, suitbale agriculture and other lands were changed and earmarked for Industrial use. There fore the enteprenuer has to procure the land in such industrial use as shown in the Master plan, to implement planned developemnt for liviable conditions in cities and towns. It is mandatory for any individual / company including Govt. Dept. to follow the landuses specified in Master plan, violation is punishable offence with imprisonment for a period of 3 years or with a fine of 10% of value of land and building or both as per the provisions of respective Acts.

Change of Master Plan Landuse is not generally permissible except in specific cases where surrounding developments deserves for effecting change.

However, Online CLU module is under preperation. The procedure and documents required are alredy kept in DT&CP website (dtcp.ap.gov.in).
32 Remove the permission required for CLU for conversion of land with non-industrial use to industrial land, if the land falls in the industrial zone, as displayed in the State's/UT's draft/ final regional/ development plan or draft/ final town planning schemes Department of Revenue/ T&CP or equivalent 1 If the land covered by Industrial use in the Master Plan / GTP/ ZDP, the CLU to Industrial use is not required.
33 Certification for establishing ownership Establish a Certification Authority that provides certificates for government guarantees on land titles in urban areas and offers indemnity for losses occurred due to the defect of title Urban Land Title Certification Authority (New authority) 2 Urban Land Title Certification Authority has to be established with consultation with CCLA, SSLR, DMA & DT&CP
52 Uniform Building Code Enact a comprehensive uniform building code/building by-law with the following features:
  • Applicable to all urban areas and industrial estates/parks in the State.
  • Provisions for risk-based classification of buildings
  • Accreditation programs and clear responsibilities for professionals including architects and engineers engaged in the construction process along with qualifications for accreditation under the program
All ULBs, IDCs, Development Authorities, T&CP 3 Already been incorporated in A.P Building Rules 2017
53 Accreditation Program Design and develop an online system for obtaining accreditations for professionals including architects and structural engineers engaged in the construction process. The system should allow online application submission, document submission, payment and approvals All ULBs, IDCs, Development Authorities, T&CP 1 Online registration has been incorporated in APDPMS.
54 Allow verification of accreditations issued by the authority for professionals online. Incorporate a feature to ask feedback from users of professionals All ULBs, IDCs, Development Authorities, T&CP 1 Under consideration
55 Master Plans Develop Master plans/Zonal plans/land use plans with legal sanction for all urban areas and make it available online in public domain All ULBs, IDCs, Development Authorities, T&CP 1 Already available in the DT&CP website (www.dtcp.gov.in)
56 Construction Permit Procedure and Information Publish information about the procedure and a comprehensive list of documents including pre-construction and post-construction No Objection Certificates (NOCs), registrations and other mandatory State approvals (prior to plinth and pre - occupancy) on the website for rural areas All ULBs, IDCs, Development Authorities, T&CP 1 Already available in the DT&CP website (www.dtcp.gov.in)
57 Publish information about the procedure and a comprehensive list of documents including pre-construction and post-construction No Objection Certificates (NOCs), registrations and other mandatory State approvals (prior to plinth and pre - occupancy) on the website for urban and industrial areas All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
59 Construction Permit Define clear timelines mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation to grant construction permits including all required approvals granted by State Government Departments and agencies. The approvals must cover pre-construction, construction and post construction stages All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
59 Define clear timelines mandated through the Public Service Delivery Guarantee Act(or equivalent) that construction permits are provided within 45 days:
  • Building Plan approval is provided within 30 days
  • Plinth Inspection is done within 7 days of intimation
  • Final Completion/Occupancy Certificate is provided within 8 days ( 7 days for inspection + 1 day for issuing the certificate)
All ULBs, IDCs, Development Authorities, T&CP 3 Times lines specifed in A.P Public Services Dilivery Rules, 2017
Building plan approval - 10 days
Plinth Inspection - Not Mandatory
Occupancy - 8 Days
60 Design and develop an online single window system for granting construction permits with following functionalities:
  • A common integrated application provided on the online single window system, for all internal and external agencies required to provide applicable NOCs/approvals ( Fire Services, Water and Sewerage Department, Electricity, Forest, Labour, Traffic, Factory Directorate, DISCOMs, AAI and NMA)
  • Provision for making an online application with integrated payment without the need for a physical touch point for document submission and verification
  • The system should allow auto scrutiny of building plans from compliance perspective according to the uniform Building Codes/Building By-law using AutoDCR (or similar) software
  • Provision for e-intimation of commencement of construction
  • Provision for e-intimation of plinth level completion
  • Provision for online common completion request form cum Occupancy Certificate application with online payment of fee
  • Provision for online issuance of certificate of inspections
  • Provision for online issuance of digitally signed Occupancy cum Completion Certificate to the applicant
All ULBs, IDCs, Development Authorities, T&CP 8 Other aspects are covered for constrcution permit except for e-intimation. E-intimation for commencement of work is to be implemented in APDPMS.
61 Mandate that a single, joint site inspection will be carried out by all concerned authorities such as Fire, Water and Sewerage, Electricity, Labour (such as Factory license) Department and other internal Departments responsible for granting construction permits in urban areas and IDCs All ULBs, IDCs, Development Authorities, T&CP 4 Already incorporated
62 Implement a system which allows grant of approval to Low Risk buildings based on third party certification (during building plan approval and/or construction and/or completion stage) of structural design and architectural drawings across all urban areas and IDCs All ULBs, IDCs, Development Authorities, T&CP 1 Implemented Online approval system which allows grant of approval based on plans uploaded by Third Party. i.e Architect/LTPs
63 Combine all affidavits & undertakings required to be submitted for obtaining the building plan approval into one e-undertaking All ULBs, IDCs, Development Authorities, T&CP 1 Combined Affidavit and undertakings for obtaining the building plan approval already incorporated in APDPMS in Annexure -3 of A.P building Rules-2017.

e-undertaking is to be implemented
64 Establish an independent grievance redressal mechanism for land and construction permits All ULBs, IDCs, Development Authorities, T&CP 1 Request Tracking System (RTS) is incoporated in APDPMS (www.apdpms.ap.gov.in).

A G.O 223, M.A, Dt:09-07-2018 has been issued constituting Appleate Committee on the dicision of Approving Authority Consisting of Principal secretary, MA&UD, OSR, MA&UD and DT&CP.

But independent redressal mechanism not established. The same shall be initated immediately.
65 Inspection by Building Proposal Office/ relevant agency as part of Building Plan Approval Process Publish a well-defined inspection procedure, checklist on the Department's web site All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
66 Design and implement a computerized system which is capable of:
  • Identifying buildings/areas that need to be inspected based on risk assessment
  • Computerized allocation of inspectors
  • Allowing users to view and download submitted inspection reports
All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
67 Mandate online submission of inspection report within 48 hours to the Department All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
68 Inspection by Building Proposal Office/ relevant agency as part of obtaining certificate for plinth level inspection Publish a well-defined inspection procedure, checklist on the Department's web site All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
69 Design and implement a computerized system which is capable of:
  • Identifying buildings/areas that need to be inspected based on risk assessment
  • Computerized allocation of inspectors
  • Allowing users to view and download submitted inspection reports
All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
70 Mandate online submission of inspection report within 48 hours to the Department All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
71 Completion and Occupancy Certificate and Inspection by Building Proposal Office/ relevant agency as part of obtaining Occupancy/ Completion Certificate Allow authorized architects to issue the Completion Certificate at all urban areas and IDCs, instead of requiring a separate Completion Certificate to be issued All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
72 Publish a well-defined inspection procedure, checklist on the Department's web site All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
73 Design and implement a computerized system which is capable of:
  • Identifying buildings/areas that need to be inspected based on risk assessment
  • Computerized allocation of inspectors
  • Allowing users to view and download submitted inspection reports
All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
74 Mandate online submission of inspection report within 48 hours to the Department All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
75 NOC for tree felling from Tree Authority/ appropriate authority (prior to commencement of construction activities) Furnish information and implement an online application system with the following features and mandate that all applications are submitted online
  • Publish information about the procedure and a comprehensive list of documents required on the Department's website
  • Publish clear timelines on the Department's website mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for decision (approval/ rejection) on the application
  • Allow online application submission, payment thereof, tacking and monitoring without any need of physical touch point for document submission and verification
  • Ensure that the system allows the user to download final signed approval certificate
All ULBs, IDCs, Development Authorities, T&CP 4 Already incorporated
76 Publish a well-defined inspection procedure, checklist on the Department's web site All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
77 Design and implement a computerized system which is capable of:
  • Identifying buildings/areas that need to be inspected based on risk assessment
  • Computerized allocation of inspectors
  • Allowing users to view and download submitted inspection reports
All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
78 Mandate online submission of inspection report within 48 hours to the Department All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
79 NOC for tree transit from Tree Authority/ appropriate authority Furnish information and implement an online application system with the following features and mandate that all applications are submitted online
  • Publish information about the procedure and a comprehensive list of documents required on the Department's website
  • Publish clear timelines on the Department's website mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for decision (approval/ rejection) on the application
  • Allow online application submission, payment thereof, tacking and monitoring without any need of physical touch point for document submission and verification
  • Ensure that the system allows the user to download final signed approval certificate
All ULBs, IDCs, Development Authorities, T&CP 4 Already incorporated
80 Application for erection of a lift and related inspections Furnish information and implement an online application system with the following features and mandate that all applications are submitted online
  • Publish information about the procedure and a comprehensive list of documents required on the Department's website
  • Publish clear timelines on the Department's website mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for decision (approval/ rejection) on the application
  • Allow online application submission, payment thereof, tacking and monitoring without any need of physical touch point for document submission and verification
  • Ensure that the system allows the user to download final signed approval certificate
All ULBs, IDCs, Development Authorities, T&CP, Chief Electrical Inspectorate 4 No separate permission is required for erection of lift.
81 Publish a well-defined inspection procedure, checklist on the Department's web site All ULBs, IDCs, Development Authorities, T&CP, Chief Electrical Inspectorate 1
82 Design and implement a computerized system which is capable of:
  • Identifying buildings/areas that need to be inspected based on risk assessment
  • Computerized allocation of inspectors
  • Allowing users to view and download submitted inspection reports
All ULBs, IDCs, Development Authorities, T&CP, Chief Electrical Inspectorate 1
83 Mandate online submission of inspection report within 48 hours to the Department All ULBs, IDCs, Development Authorities, T&CP, Chief Electrical Inspectorate 1
84 Tree re-planting Publish online applicable replanting requirements within the State/UT All ULBs, IDCs, Development Authorities, T&CP 1 Not related to DT&CP
85 NOC from Fire Department (pre-construction and post- construction) and its inspection Furnish information and implement an online application system with the following features and mandate that all applications are submitted online
  • Publish information about the procedure and a comprehensive list of documents required on the Department's website
  • Publish clear timelines on the Department's website mandated through the Public Service Delivery Guarantee Act (or equivalent) legislation for decision (approval/ rejection) on the application
  • Allow online application submission, payment thereof, tacking and monitoring without any need of physical touch point for document submission and verification
  • Ensure that the system allows the user to download final signed approval certificate
  • Allow third parties to verify the final approval certificates in public domain
All ULBs, IDCs, Development Authorities, T&CP 4 Already incorporated
86 Publish a well-defined inspection procedure, checklist on the Department's web site All ULBs, IDCs, Development Authorities, T&CP 1 Already incorporated
87 Design and implement a computerized system which is capable of:
  • Identifying buildings/areas that need to be inspected based on risk assessment
  • Computerized allocation of inspectors
  • Allowing users to view and download submitted inspection reports
All ULBs, IDCs, Development Authorities, T&CP 1 As per A.P Building Rules - 2017, Annexure-3, Licience Strucural Engineer/ Architect/LTPs are made responsible to inspect construction at founadation level uner each roof/ slab level and submit a periodical level to the Commissioner of ULB.

Strctural Engineers shall be responsible for Structural aspects of building.
88 Mandate online submission of inspection report within 48 hours to the Department All ULBs, IDCs, Development Authorities, T&CP 1 Has to be discussed in consultation with Fire Dept.
89 Obtaining gas connection Modify the Building regulations/Bylaws to incorporate Piped Natural Gas (PNG) as a utility service Urban Development Authorities/Town & Country Planning Department 1 Already Covered in Rule No.69 of A.P building Rules-2017